About the project
By overlaying a 3D model on a partly built structure, you can spot deviations from the plan early and prevent cost overruns. The model can be shown in several variants — with the details scheduled to appear by a given date.
What we did
- 01Checking as-built against the design intent
- 02Visual hints for the on-site team
- 03Recording and discussing deviations
Result
Control becomes visual and clear to everyone involved in construction.